Climate Data Wrangler
Flood Msmt. Explorer
N-Dimensional Space
Recognition Heuristic
Bokeh Demo App
Climate Data Wrangler
Flood Measurement Explorer
N-Dimensional Space
Recognition Heuristic
Bokeh Demo App
DK HYDROTECH
DK HYDROTECH
APPLICATIONS
arrow_drop_down
PROJECTS
CONTACT
HOME
APPLICATIONS
arrow_drop_down
PROJECTS
CONTACT
menu
Hazard Reporting (2019-2022)
Automated data retrieval and analysis for remote site access
(Title image: [Mount Meager Landslide from Wikipedia](https://en.wikipedia.org/wiki/2010_Mount_Meager_landslide)) Located north-west of Pemberton, British Columbia, the Upper Lillooet Hydroelectric Project (ULHEP) consists of two run-of-river hydropower facilities with a combined installed capacity of 107 MW. The area is known for a [major landslide occurring at Mt. Meager in 2010](https://thetyee.ca/News/2010/08/12/MeagerLandslide/). A [Landslide Risk Management Plan (LRMP)](https://www.for.gov.bc.ca/ftp/dsq/external/!publish/Landslide_and_Flooding_Risks/MMVC_Hotsprings_OSPFigs_V1.pdf) was developed (by others) for ongoing operations work at the ULHEP, and DK Hydrotech implemented an automated climate data aggregation, analysis, and reporting system to support field work planning based on the LRMP criteria.
Posted: Jan. 17, 2021
[base64]